|
For more recent
reports on this topic, contact us.
Copies of these
reports may be ordered from BHR Group
for £70 sterling (EU) or £80 sterling (elsewhere) per
copy of each report, discounted for Subscribers to the Information
Service. This includes first class postage (UK) or standard airmail
postage (elsewhere) and packing. For urgent delivery details please
contact us.
£12.25
sterling VAT will be added to the price per copy of each report
ordered from European Union countries outside the United Kingdom
if the buyer's VAT number is not quoted.
RR503 D.F.
Denny
Report on experiments with a 1/60
scale model of the spillway and tailbay for the Avon dam
4pp., 6 figs. (Feb. 1955)
RR552 G.A.J.
Young and M.F. Oddie
Daer Reservoir. Reports of experiments
with a scale model of the spillway channel
7pp. 51 figs (Jan. 1957)
RR570 G.A.J.
Young and L. Fellerman
Ffestiniog Pumped Storage Project.
Report of hydraulic model investigations. Part I - A study of air
entraining vortices at Stwlan intakes.
9pp. 37 figs. (Apr 1958)
RR597 D.M.
Tucker
Ffestiniog Pumped Storage Project
Report of hydraulic model investigations. Part III - A study of
flow conditions through the lower bend and bifurcation.
4pp. 18 figs (Aug. 1958)
RR604 G.A.J.
Young and D.M. Tucker
Hong Kong Water Supply - Lan Tao
Scheme Report of model tests of the bellmouth spillway for the Shek
Pik Reservoir
8pp 20 figs. (Nov. 1958)
SP629 G.A.J.
Young, J.A. Charlton and D.M Tucker
Liverpool Corporation Waterworks
Tryweryn Reservoir. Report of tests on a model of the draw-off tower
15pp. 19 figs. (Jun. 1959)
RR641 J.A.
Charlton
Model tests on the bellmouth spillway
for Tittesworth Reservoir. Staffordshire Potteries Water Board
4pp. 1 figs. (Nov. 1959)
RR642 G.A.J.
Young and L. Fellerman
Ffestiniog Pumped Storage Project
Report of the hydraulic model investigations. Part IV - Further
experiments on methods of preventing air-entrainment at the Stwlan
intakes.
6pp. 26 figs. (Nov. 1959)
RR646 D.M.
Tucker
Bridgewater Corporation - Hawkridge
Reservoir. Report of model tests of the overflow spillway
5pp. 10 fig. (Jan. 1960)
RR649 G.A.J.
Young and D.M. Tucker
Penzance Corporation - Lower Drift
Reservoir. Report of model tests of overflow spillway and tailbay
6pp. 10 figs (Jan. 1960)
RR662 G.A.J.
Young and D.M. Tucker
Tang-E Soleyman Dam - Report of
model studies of the spillway structures
16pp. 23 figs. (Jun. 1960)
RR681 G.A.J.
Young and D.M. Tucker
City of Leeds - Thruscross Reservoir
Investigation of the hydraulic design of the overflow spillway and
tailwater channel
11pp. 17 figs (Jan. 1961)
RR688 G.A.J.
Young and C.K. Warren
Report of model tests on the Lamaload
Dam spillway system
9pp. 13 figs (Mar. 1961)
RR705 C.K.
Warren
Report on model tests on the Sasamua
Dam Spillway
4pp. 9 figs. (Oct. 1961)
RR737 J.A.
Charlton
Model tests of Stourhead Siphon
Spillway
7pp. 16 figs. (Jun. 1962)
RR805 M.
Sutton
Hydraulic model tests on a side
channel spillway - Glen Finglas Project
6pp. 35 figs. (Apr. 1964)
RR827 Dr.
P.J. Baker
Further model tests on a proposed
flexible fabric dam for the Mangla Dam project, Pakistan
4pp. 6 figs. (Nov. 1964)
RR828 G.A.J.
Young
Latiyan Dam - Report of hydraulic
model investigations. Part I - Preliminary model tests. Part 2 -
Combined right-bank tunnel spillway and central chute spillway scheme.
A - central chute spillway
30pp. 22 figs. (Oct. 1964)
RR829 G.A.J.
Young
Latiyan Dam - Report of hydraulic
model investigations. Part 2: Combined rightbank tunnel spillway
and central chute spillway scheme B - Right- bank tunnel spillway
with radial gate (Design 1): C - Right-bank tunnel spillway with
radial gate (Design 2)
54pp. 33 figs. (Oct. 1964)
RR836 D.H.
Buxton
Latiyan Dam - Report of hydraulic
model investigations on the Talow Tunnel intake and hollow-jet valve
stilling basin
9pp. 33 figs. (Aug. 1965)
RR841 L.
Fellerman
Model tests of Shek Pik siphon
spillway Tung Chung water scheme
6pp. 17 figs. (Mar. 1965)
RR846 L.
Fellerman
Lake Victoria additional discharges
- Report on model tests on siphon spillways for Owen Falls dam
4pp. 13 figs. (Sep. 1965)
RR848 L.
Fellerman and D.H. Buxton
Chowilla Dam - A study of the distribution
of velocities in the approaches to the spillway
4pp. 24 figs. (Sep. 1965)
RR863 D.S.
Miller
Model studies of Barikese dam siphon
spillway, Kumasi water supply
6pp. 11 figs. (Aug. 1966)
RR872 D.S.
Miller
Model studies of the bellmouth
overflow works for Bough Beech reservoir
5pp. 16 figs. (Mar. 1967)
TN873 A.
Linford
A review of literature on the construction
of rockfill dams by dumping stones in running water
49pp. 42 figs. (Mar. 1967)
RR882 D.S.
Miller
Model investigations of the intakes
to a dropshaft at Hok Tau reservoir, Plover Cove water supply scheme,
Hong Kong
6pp. 18 figs. (Mar. 1967)
RR884 L.
Fellerman
Wanganui dam hydraulic model study
of spillway and tailbay
4pp. 15 figs. (Feb. 1967)
RR888 A.
Linford and D.H. Saunders
A hydraulic investigation of through
and overflow rockfill dams
17pp. 74 figs. (Mar. 1967)
RR944 K.J.
Enever and L. Fellerman
Model tests on the Tabqa intake
stilling basins. Euphrates basin development
4pp. 13 figs. (Mar. 1968)
RR949 A.M.B.
Sankies and L. Fellerman
Model studies of a bellmouth and
stilling basin for Scammonden reservoir
6pp. 23 figs. (May 1968)
RR956 L.
Fellerman
Hydraulic model study of Pouto
stream bed intake. Tongariro power development scheme
6pp. 31 figs. (Jul. 1968)
RR979 S.D.L.
Williams
Model study of the overflow works
at Burnhope Burn-Derwent reservoir
7pp. 14 figs. (Jan. 1969)
RR1018 L.
Fellerman and C. Shuker
Report on the hydraulic model study
on the hollow jet valve stilling basin for Fahrahnaz Pahlavi Dam
(Latiyan)
5pp. 22 figs. (Aug. 1969)
RR1048 A.P.
Boldy
Stocks Reservoir spillway - hydraulic
model tests
6pp. 38 figs. (Apr. 1970)
RR1065 E.G.
Arato and L. Fellerman
Hydraulic model tests on the proposed
Moawhango dam
7pp. 24 figs. (Jun. 1970)
RR1074 A.Y.
Al-Dabbagh and L. Fellerman
Hydraulic model tests on Shashe
Dam (Botswana)
33pp. incl. 31 figs. (Sep. 1970)
RR1149 D.S.
Miller
Stratification control in reservoirs,
Farmoor Stage 1
23pp. 21 figs. (Oct. 1972)
RR1186 E.G.
Arato
Hydraulic model studies of the
Lar Dam irrigation control works
50pp. 67 figs. (May 1973)
RR1224 E.G.
Arato
Hydraulic model study of the Lar
dam main spillway arrangement
37pp. 52 figs. (Feb. 1974)
RR1226 E.G.
Arato
Hydraulic and mobile bed studies
relating to the spillway arrangement of Hazelmere Dam
43pp. 42 figs. (Feb. 1974)
RR1237 A.
Magnall
Model study of spillway for Stocks
reservoir: stage II
45pp. 39 figs. (Sep. 1974)
RR1359 E.G.
Arato and B.A. Bruce
Lar Dam project - hydraulic model
studies of the Lavarak forebay and by-pass ponds
25pp. 30 figs (Jul. 1976)
RR1372 E.G.
Arato and B.A. Bruce
Lar dam and tunnels project - Lavarak
by-pass stilling basin
17pp. 26 figs (Sep. 1976)
RR1419 B.A.
Bruce and E.G. Arato
Savannah Sugar company irrigation
scheme: hydraulic model tests on Kiri dam
38pp. 39 figs (Jul. 1977)
RR1441 E.G.
Arato and M.W. Payne
Tana river, upper reservoir scheme
Hydraulic and mobile bed studies relating to the spillway arrangement
26 pp. 24 figs (Nov. 1977)
RR1549 A.J.
Hamilton
Colliford reservoir hydraulic model
study of the bellmouth spillway and stilling basin
31pp. 31 figs. (May 1979)
RR1557 S.D.L.
Barnes
Asprokremmos Dam. Part 1: hydraulic
model tests of tunnel and spillway
52pp. 70 figs. (Jul. 1979)
RR1558 D.J.O.
Wilson
Asprokremmos Dam. Part 2: model
testing of the redesigned spillway
35pp. 36 figs. (Jul. 1979)
RR1570 M.H.
Palmer
Hydraulic model study of the air
regulated siphonic spillway at Hall Place Reservoir
8pp. 14 figs. (Oct. 1979)
RR1588 E.G.
Arato and M.W. Payne
Tana River upper reservoir scheme.
Hydraulic model studies of the diversion arrangements, the low level
outlet and the power conduits
13pp. 29 figs. (Feb. 1980)
RR1595 J.B.
Nystrom
Hammad Grouz spillway model
11pp. 33 figs. (May 1980)
RR1704 B.A.
Brighouse
Wentwood Spillway Hydraulic Model
Studies.
5pp. 34 figs. (May 1981)
RR1777 B.A.
Bruce and K. Austin
Vasilikos-Pendaskinos Project -
Hydraulic model studies of Kalavasos Dam flood discharge spillway
and gully.
16pp. 13 figs. (Dec. 1981)
RR1778 B.A.
Bruce and K. Austin
Vasilikos-Pendaskinos Project -
Hydraulic model studies of Dhypotamos Dam flood discharge spillway
and gully.
13pp. 14 figs. (Dec. 1981)
RR1891 P.
Avery
Victoria Dam surge chamber: Model
tests on throttle.
10pp. 10 figs. (Aug. 1982)
RR2037 M.W.
Payne and M.J. Prosser
Hydraulic model of Beni Amrane
dam and spillway
19pp. 107 figs. (Jun. 1983)
RR2116 P.
Avery
Cyprus Southern Conveyor: Akhna
Dam hydraulic model study.
6pp.8 figs. (Nov. 1983)
RR2307 P.
Avery
Derwent Valley Reservoirs: hydraulic
model test on Ladybower spillways and tailbay
15pp. 17 figs (Oct. 1984)
RR2442 A.
Clarke
Calibration of the Derwent Dam
ogee spillway
2pp. 5 figs (Jun. 1985)
RR2462 A.
Clarke and E.G. Arato
Roadford reservoir hydraulic model
studies of the overflow system and flood plain
21p 55 figs (Jul. 1985)
RR2463 E.G.
Arato and A. Clarke
Hydraulic and erosion studies of
the Thissavros spillway and plunge pool
16pp. 61 figs (Jul. 1985)
|