Home   About Us  Email Us

Search:

 

Information Services

  Research Reports
 
Conferences
Books and Proceedings
Training
Contact us

 

 
Information Services: Technical Reports Catalogue
Model Studies of Reservoirs, Spillways and Dams

Please note that BHR Group's main website has moved.
We can be found at www.bhrgroup.com

For more recent reports on this topic, contact us.

Copies of these reports may be ordered from BHR Group for £70 sterling (EU) or £80 sterling (elsewhere) per copy of each report. This includes first class postage (UK) or standard airmail postage (elsewhere) and packing. For urgent delivery details please contact us.

£12.25 sterling VAT will be added to the price per copy of each report ordered from European Union countries outside the United Kingdom if the buyer's VAT number is not quoted.

RR503 D.F. Denny
Report on experiments with a 1/60 scale model of the spillway and tailbay for the Avon dam
4pp., 6 figs. (Feb. 1955)

RR552 G.A.J. Young and M.F. Oddie
Daer Reservoir. Reports of experiments with a scale model of the spillway channel
7pp. 51 figs (Jan. 1957)

RR570 G.A.J. Young and L. Fellerman
Ffestiniog Pumped Storage Project. Report of hydraulic model investigations. Part I - A study of air entraining vortices at Stwlan intakes.
9pp. 37 figs. (Apr 1958)

RR597 D.M. Tucker
Ffestiniog Pumped Storage Project Report of hydraulic model investigations. Part III - A study of flow conditions through the lower bend and bifurcation.
4pp. 18 figs (Aug. 1958)

RR604 G.A.J. Young and D.M. Tucker
Hong Kong Water Supply - Lan Tao Scheme Report of model tests of the bellmouth spillway for the Shek Pik Reservoir
8pp 20 figs. (Nov. 1958)

SP629 G.A.J. Young, J.A. Charlton and D.M Tucker
Liverpool Corporation Waterworks Tryweryn Reservoir. Report of tests on a model of the draw-off tower
15pp. 19 figs. (Jun. 1959)

RR641 J.A. Charlton
Model tests on the bellmouth spillway for Tittesworth Reservoir. Staffordshire Potteries Water Board
4pp. 1 figs. (Nov. 1959)

RR642 G.A.J. Young and L. Fellerman
Ffestiniog Pumped Storage Project Report of the hydraulic model investigations. Part IV - Further experiments on methods of preventing air-entrainment at the Stwlan intakes.
6pp. 26 figs. (Nov. 1959)

RR646 D.M. Tucker
Bridgewater Corporation - Hawkridge Reservoir. Report of model tests of the overflow spillway
5pp. 10 fig. (Jan. 1960)

RR649 G.A.J. Young and D.M. Tucker
Penzance Corporation - Lower Drift Reservoir. Report of model tests of overflow spillway and tailbay
6pp. 10 figs (Jan. 1960)

RR662 G.A.J. Young and D.M. Tucker
Tang-E Soleyman Dam - Report of model studies of the spillway structures
16pp. 23 figs. (Jun. 1960)

RR681 G.A.J. Young and D.M. Tucker
City of Leeds - Thruscross Reservoir Investigation of the hydraulic design of the overflow spillway and tailwater channel
11pp. 17 figs (Jan. 1961)

RR688 G.A.J. Young and C.K. Warren
Report of model tests on the Lamaload Dam spillway system
9pp. 13 figs (Mar. 1961)

RR705 C.K. Warren
Report on model tests on the Sasamua Dam Spillway
4pp. 9 figs. (Oct. 1961)

RR737 J.A. Charlton
Model tests of Stourhead Siphon Spillway
7pp. 16 figs. (Jun. 1962)

RR805 M. Sutton
Hydraulic model tests on a side channel spillway - Glen Finglas Project
6pp. 35 figs. (Apr. 1964)

RR827 Dr. P.J. Baker
Further model tests on a proposed flexible fabric dam for the Mangla Dam project, Pakistan
4pp. 6 figs. (Nov. 1964)

RR828 G.A.J. Young
Latiyan Dam - Report of hydraulic model investigations. Part I - Preliminary model tests. Part 2 - Combined right-bank tunnel spillway and central chute spillway scheme. A - central chute spillway
30pp. 22 figs. (Oct. 1964)

RR829 G.A.J. Young
Latiyan Dam - Report of hydraulic model investigations. Part 2: Combined rightbank tunnel spillway and central chute spillway scheme B - Right- bank tunnel spillway with radial gate (Design 1): C - Right-bank tunnel spillway with radial gate (Design 2)
54pp. 33 figs. (Oct. 1964)

RR836 D.H. Buxton
Latiyan Dam - Report of hydraulic model investigations on the Talow Tunnel intake and hollow-jet valve stilling basin
9pp. 33 figs. (Aug. 1965)

RR841 L. Fellerman
Model tests of Shek Pik siphon spillway Tung Chung water scheme
6pp. 17 figs. (Mar. 1965)

RR846 L. Fellerman
Lake Victoria additional discharges - Report on model tests on siphon spillways for Owen Falls dam
4pp. 13 figs. (Sep. 1965)

RR848 L. Fellerman and D.H. Buxton
Chowilla Dam - A study of the distribution of velocities in the approaches to the spillway
4pp. 24 figs. (Sep. 1965)


RR863 D.S. Miller
Model studies of Barikese dam siphon spillway, Kumasi water supply
6pp. 11 figs. (Aug. 1966)

RR872 D.S. Miller
Model studies of the bellmouth overflow works for Bough Beech reservoir
5pp. 16 figs. (Mar. 1967)

TN873 A. Linford
A review of literature on the construction of rockfill dams by dumping stones in running water
49pp. 42 figs. (Mar. 1967)

RR882 D.S. Miller
Model investigations of the intakes to a dropshaft at Hok Tau reservoir, Plover Cove water supply scheme, Hong Kong
6pp. 18 figs. (Mar. 1967)

RR884 L. Fellerman
Wanganui dam hydraulic model study of spillway and tailbay
4pp. 15 figs. (Feb. 1967)

RR888 A. Linford and D.H. Saunders
A hydraulic investigation of through and overflow rockfill dams
17pp. 74 figs. (Mar. 1967)

RR944 K.J. Enever and L. Fellerman
Model tests on the Tabqa intake stilling basins. Euphrates basin development
4pp. 13 figs. (Mar. 1968)

RR949 A.M.B. Sankies and L. Fellerman
Model studies of a bellmouth and stilling basin for Scammonden reservoir
6pp. 23 figs. (May 1968)

RR956 L. Fellerman
Hydraulic model study of Pouto stream bed intake. Tongariro power development scheme
6pp. 31 figs. (Jul. 1968)

RR979 S.D.L. Williams
Model study of the overflow works at Burnhope Burn-Derwent reservoir
7pp. 14 figs. (Jan. 1969)

RR1018 L. Fellerman and C. Shuker
Report on the hydraulic model study on the hollow jet valve stilling basin for Fahrahnaz Pahlavi Dam (Latiyan)
5pp. 22 figs. (Aug. 1969)

RR1048 A.P. Boldy
Stocks Reservoir spillway - hydraulic model tests
6pp. 38 figs. (Apr. 1970)

RR1065 E.G. Arato and L. Fellerman
Hydraulic model tests on the proposed Moawhango dam
7pp. 24 figs. (Jun. 1970)

RR1074 A.Y. Al-Dabbagh and L. Fellerman
Hydraulic model tests on Shashe Dam (Botswana)
33pp. incl. 31 figs. (Sep. 1970)

RR1149 D.S. Miller
Stratification control in reservoirs, Farmoor Stage 1
23pp. 21 figs. (Oct. 1972)

RR1186 E.G. Arato
Hydraulic model studies of the Lar Dam irrigation control works
50pp. 67 figs. (May 1973)

RR1224 E.G. Arato
Hydraulic model study of the Lar dam main spillway arrangement
37pp. 52 figs. (Feb. 1974)

RR1226 E.G. Arato
Hydraulic and mobile bed studies relating to the spillway arrangement of Hazelmere Dam
43pp. 42 figs. (Feb. 1974)

RR1237 A. Magnall
Model study of spillway for Stocks reservoir: stage II
45pp. 39 figs. (Sep. 1974)

RR1359 E.G. Arato and B.A. Bruce
Lar Dam project - hydraulic model studies of the Lavarak forebay and by-pass ponds
25pp. 30 figs (Jul. 1976)

RR1372 E.G. Arato and B.A. Bruce
Lar dam and tunnels project - Lavarak by-pass stilling basin
17pp. 26 figs (Sep. 1976)

RR1419 B.A. Bruce and E.G. Arato
Savannah Sugar company irrigation scheme: hydraulic model tests on Kiri dam
38pp. 39 figs (Jul. 1977)

RR1441 E.G. Arato and M.W. Payne
Tana river, upper reservoir scheme Hydraulic and mobile bed studies relating to the spillway arrangement
26 pp. 24 figs (Nov. 1977)

RR1549 A.J. Hamilton
Colliford reservoir hydraulic model study of the bellmouth spillway and stilling basin
31pp. 31 figs. (May 1979)

RR1557 S.D.L. Barnes
Asprokremmos Dam. Part 1: hydraulic model tests of tunnel and spillway
52pp. 70 figs. (Jul. 1979)

RR1558 D.J.O. Wilson
Asprokremmos Dam. Part 2: model testing of the redesigned spillway
35pp. 36 figs. (Jul. 1979)

RR1570 M.H. Palmer
Hydraulic model study of the air regulated siphonic spillway at Hall Place Reservoir
8pp. 14 figs. (Oct. 1979)

RR1588 E.G. Arato and M.W. Payne
Tana River upper reservoir scheme. Hydraulic model studies of the diversion arrangements, the low level outlet and the power conduits
13pp. 29 figs. (Feb. 1980)

RR1595 J.B. Nystrom
Hammad Grouz spillway model
11pp. 33 figs. (May 1980)

RR1704 B.A. Brighouse
Wentwood Spillway Hydraulic Model Studies.
5pp. 34 figs. (May 1981)

RR1777 B.A. Bruce and K. Austin
Vasilikos-Pendaskinos Project - Hydraulic model studies of Kalavasos Dam flood discharge spillway and gully.
16pp. 13 figs. (Dec. 1981)

RR1778 B.A. Bruce and K. Austin
Vasilikos-Pendaskinos Project - Hydraulic model studies of Dhypotamos Dam flood discharge spillway and gully.
13pp. 14 figs. (Dec. 1981)

RR1891 P. Avery
Victoria Dam surge chamber: Model tests on throttle.
10pp. 10 figs. (Aug. 1982)

RR2037 M.W. Payne and M.J. Prosser
Hydraulic model of Beni Amrane dam and spillway
19pp. 107 figs. (Jun. 1983)

RR2116 P. Avery
Cyprus Southern Conveyor: Akhna Dam hydraulic model study.
6pp.8 figs. (Nov. 1983)

RR2307 P. Avery
Derwent Valley Reservoirs: hydraulic model test on Ladybower spillways and tailbay
15pp. 17 figs (Oct. 1984)

RR2442 A. Clarke
Calibration of the Derwent Dam ogee spillway
2pp. 5 figs (Jun. 1985)

RR2462 A. Clarke and E.G. Arato
Roadford reservoir hydraulic model studies of the overflow system and flood plain
21p 55 figs (Jul. 1985)

RR2463 E.G. Arato and A. Clarke
Hydraulic and erosion studies of the Thissavros spillway and plunge pool
16pp. 61 figs (Jul. 1985)

 

© Copyright BHR Group Limited 2003. All rights reserved.
Comments on our website? Contact our Webmaster.