|
The ever increasing
depth of installation and extended in-service lifetimes demanded
by intelligent well installations is driving the development of
reliable electrical equipment and instrumentation for down hole
and wellhead use in deep-sea oil and gas operations.
The combination
of high pressure, high temperature, and aggressive working fluid,
make for a hostile environment with high rates of attrition. Proper
testing and development of components is therefore essential if
the high costs of in-service failures are to be avoided.
BHRSolutions
can provide simulated down hole, subsea environments for the testing
of components utilising a range of pressure vessels and temperature
controlled chambers that can accommodate a wide range of well operating
fluids. Long term installation requirements also mean that ultra
low level leakage (ULLL) and permeation become significant phenomena
in maintaining sealing integrity.
These systems
can be designed and virtually tested by BHRSolutions using
specialised permeation testing facilities in combination with FEA
based lifetime simulation software for sealing components and a
wealth of experimental data on polymer/elastomer materials in oilfield
environments.
Search
our site for your specific interest, or contact
us to discuss your particular requirements.
|
 |
The Facilities
BHRSolutions'
services include:
|